Close
Home
The Call Sheet
Contact
Contact
Home
/
The Call Sheet
Arizona
Industrial
SRP Brings 250-MW Battery Storage Project Online; Pediment BESS, located in Mesa’s tech corridor
6/16/2026
|
T&D World
• Subcategory:
Industrial: Utilities
• Tag:
Economic Development
|
Opening
|
Operations
• Additional Filters-Subcategory:
Industrial: Battery Energy Storage System (BESS)
,
Industrial: Infrastructure
Salt River Project (SRP)
Rick Hernandez
|
Power Delivery Program Manager
[email protected]
602-236-2872
Aypa Power, a Blackstone Company
Sam Littlefield
|
EVP, Development
[email protected]
737-295-0309
Additional Filters
Subcategory
Tags