/
|
A 2.6M SF life sciences campus in Louisville is one step closer to reality after developer Sterling Bay closed on $88M in bonds to fund infrastructure for the long-awaited Redtail Ridge project.
The 389-acre Redtail Ridge site along U.S. Highway 36, the main thoroughfare connecting Denver and Boulder through Louisville, has been vacant for about two decades, stalled by political controversy and local pushback. In 2021, Louisville City Council narrowly approved a previous version of the project, but voters overturned it the following year, Boulder Weekly reported.