Solar Cell Maker, T1 Energy (fka Freyr Battery) Building $850M Plant at Former Alcoa Plant in Milam County, called G2 Austin

  • 3/17/2025

|

Connect CRE
• Subcategory:
• Additional Filters-Subcategory:

T1 Energy Inc., formerly Freyr Battery Inc., will open an $850 million solar cell manufacturing facility in Milam County, just outside Round Rock. The plant, called G2 Austin, will create up to 1,800 jobs.

T1 executed a lease-and-purchase option for 100 acres at the 3,300-acre Advanced Manufacturing Logistix Campus (AMLC), which used to be the campus site for the Alcoa aluminum smelter plant.

G2 Austin is expected to start production in the second half of 2026. T1 boasts that G2 Austin will be one of the largest solar manufacturing facilities in the U.S.

T1 Energy Inc. (NYSE: FREY)
Einar Kilde | Chief Development Officer

Additional Filters

Subcategory
Tags